2017 – 2018 Snow Removal Policy & Map

Snow Removal Map

SNOW EMERGENCY POLICY

AREAS AFFECTED:  The following regulations will be enforced to allow the plowing of snow from any highway, street, alley, public parking lot or other public place in the City and the removal of snow from portions of the downtown area and East Bridge Street.

NOTIFICATION AND SEQUENCE:  Public notice will be given on KLGR Radio announcing the declaration of a snow emergency prior to enforcement of these regulations.  Such notice will identify the beginning time and type of streets covered by each phase of the snow plowing and removal operations.

The Snow Emergency Phase will begin first, followed by Phase 1 and Phase 2.  Emergency Routes may be plowed before a storm has ended but Phase 1 and 2 routes will generally not be plowed until snow has stopped falling. Snow will be removed from the downtown area and East Bridge Street between midnight and 7:00 a.m., generally following Phase 2.

PLOWING OF SNOW EMERGENCY ROUTES WITHOUT PUBLIC NOTIFICATION:  All Snow Emergency Routes are posted “No Parking over 2 inches” and may be plowed multiple times during a storm.  Parking tickets will be issued during plowing of emergency routes without notification.

Information about beginning times for each phase of a snow emergency may also be obtained by calling 637-5755.

LOCATION OF OPERATIONS:  Snow Emergency Routes will be plowed from curb to curb when two or more inches of snow have fallen.  No parking will be allowed on these streets until they have been completely plowed or until Phase 1 goes into effect.  Snow Emergency Routes include Fallwood Road from DeKalb St. (CSAH 101) to Gould Street, McPhail Drive from East Broadway (T.H. 67) to Fallwood Road, Gould Street from East Broadway (T.H. 67) to Second Street, Second Street from Gould Street to Mill Street, Swain Street from Second Street to Northwood Drive, Northwood Drive from Swain Street to CSAH 101, Elm Street from Swain Street to fairgrounds, Fourth Street from Gould Street to Mill Street (T.H. 71), Wyoming Street from Mill Street to Ramsey Street (T.H. 71), Halvorson Street from East Broadway (T.H. 67) to Normandale Road, Lincoln Street from East Broadway (T.H. 67) to East Bridge Street (T.H. 19 & 71), Grove Street from West Bridge Street (T.H. 19) to Pleasant Street, Middle Street from Grove Street to Baker Drive, Broadway from S. Ramsey Street (T.H. 71) to Mill Street, Cook Street from McPhail Street to Hwy 19 & 71 East, Sunrise Boulevard from Cook Street to Meadow Lane, Meadow Lane from Sunrise Blvd. to DeKalb Street, Sunrise Boulevard from East Broadway (T.H. 67) to Knollwood Drive, Frontage Roads, both sides, along Hwy 19 & 71, Gould Street from Hwy 67 to Normandale Road, Second Street from Lincoln Street to Minnesota Street, all roads in the Industrial Park and all downtown streets and parking lots.  Parking lots are signed for limited parking.

Phase 1 will include plowing of all remaining north-south streets.  All streets in Sunnyside Addition, Knollwood, Prairie Knoll, Northwood Terrace, Burr Oaks, Peavy Addition, all streets west of the bridge across the Redwood River and Twelfth Street will be included in Phase 1.

Phase 2 will include plowing of all remaining east-west streets.  No parking will be allowed on downtown business streets from Midnight to 7:00 a.m.

ENFORCEMENT:  Any motor vehicle, trailer, semi-trailer or other personal property in and upon any highway, street, alley, public parking lot or other public place lying within the Emergency, Phase 1 or Phase 2 areas during the announced times, will be held in violation of appropriate sections of Chapters 7, 8, and 9 of the City Code and tagged as follows:

Snow Emergency Routes – Tags will be issued, beginning with snow accumulation of 2 inches or more, to vehicles and property parked on Snow Emergency Routes.  The Snow Emergency Phase may be done multiple times and will continue until snowfall ends and the routes completely plowed or until Phase 1 goes into effect, at which time normal parking may be resumed.

Phase 1 Routes – Tags will be issued, beginning with the announced time, to vehicles and property located in Phase 1 areas.  Phase 1 will continue until all streets and parking lots are completely plowed or until Phase 2 goes into effect, at which time normal parking may be resumed.

Phase 2 Routes – Tags will be issued, beginning with the announced time, to vehicles and property located in Phase 2 areas.  Phase 2 will continue until all streets are completely plowed or until the termination of Phase 2 is announced, at which time normal parking may be resumed.

REMOVAL OF VEHICLES:  All tagged vehicles or property improperly parked during a snow emergency will be fined in accordance with the current fee schedule for parking fines and will be removed and stored at owner’s expense beginning 8 hours after being tagged.  Descriptions and locations of vehicles and property so removed can be obtained at the office of the City Administrator or the Police Department.  Any vehicle or property remaining unclaimed for a period in excess of 15 days will be disposed of in accordance with Chapter 2.80 of the City Code.

SNOW REMOVAL FROM SIDEWALKS AND PRIVATE PROPERTY:  All snow removed from sidewalks and private property shall be handled so as not to cause snow to lie in traveled public rights of way; with the exception, snow from the public sidewalks may be swept or shoveled from portions of the downtown area and East Bridge Street prior to snow removal by City crews.

 